Room silencing, vibration reduction, vibration and noise measurements
In September 2023, together with GERB, we participated in the International Railway Fair in Gdańsk.
On June 26-29, 2022, we took part in the Noise Control conference in Lidzbarg Warmiński.
Together with GERB, we delivered a vibration damper (TMD) for the tower located on the roof of the Varso Tower building in Warsaw. This building is currently the tallest building in the European Union.
Vibration isolation of a helicopter landing pad at a hospital in Toruń
In March 2020, we applied Sonaspray acoustic plaster in the Sports and Entertainment Hall under construction in Ostrów Wielkopolski. Black plaster was applied to the ceiling surface made of trapezoidal sheet metal.
In July 2019 and February 2020, we applied Sonaspray K-13 acoustic plaster on the ceiling of two corridors in Primary School No. 36 in Wrocław.
In September 2019, together with GERB, we participated in the International Railway Fair in Gdańsk.
We made Sonaspray K-13 acoustic plaster in the rooms of the Music School in Brodnica.
In April 2019, we completed the Sonaspray K-13 acoustic plaster on the ceiling of the banquet hall in Rydzyna.
We delivered 12 GP type spring vibration isolators for the helicopter landing pad. The landing site is located at the hospital of the Ministry of Internal Affairs and Administration with the Warmia-Masuria Oncology Center in Olsztyn.
We delivered 100 TK and TVEK vibration isolators for the turbogenerator and 60 GY and GYV vibration isolators for two fans in the new block of the Kozienice Power Plant.
We have provided tuned mass dampers (TMD) for the footbridge over Szare Szeregi Street in Radom.
The mounted dampers caused a significant reduction of footbridge vibrations.
The object was opened in January 2018.
We participated in Infraszyn conference in Zakopane (28-30 april 2017).
We participated in Noise Control 2016 conference in Gniew (22-25 may 2016).
We participated in international conference FORUM ACUSTICUM in Krakow (7-12.09.2014).